Heuristic method of assembly scheduling of multi-option products for assembly line with intermediate buffers
PDF (English)

Keywords

heuristic, relaxation, assembly line, optimization, scheduling, linear programming

How to Cite

Magiera, M. (2019). Heuristic method of assembly scheduling of multi-option products for assembly line with intermediate buffers . Technologia I Automatyzacja Montażu (Assembly Techniques and Technologies), 105(3), 4-10. Retrieved from https://journals.prz.edu.pl/tiam/article/view/1002

Abstract

The method intended to build the possibly shortest assembly schedules is presented in the paper. The method is constructed for assembly lines without parallel machines. The intermediate buffers are located between the assembly machines. A flow of products of different types is unidirectional in the assembly line. The proposed method is a heuristic because the fixed tasks are characterized by a large size and considerable computational complexity. It is a relaxation heuristic. The linear mathematical model is used in the mentioned heuristic method. The method is constructed for assembly scheduling for multioption products. Assembly of various types of products in different variants is the reply to the contemporary challenges faced by the manufacturers, who try to satisfy the demands of individual customers. The planned downtimes of machines are regarded in the method, for example downtime of machines connected with maintenance. The results of computational experiments with proposed heuristic method are presented. The described heuristic method is compared with optimal method based on the integer programming. The fixed makespans and computational fixed times using heuristic method and optimal method are compared. 

This is an Open Access article distributed under the terms of the Creative Commons Attribution License CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/)

PDF (English)

References

Bhongade A.S., Khodke P.M.: Heuristics for production scheduling problem with machining and assembly operations. International Journal of Industrial Engineering Computations, 3 (2), 2012, 185-198.

Campo C., Pauser S., Steiner S., Vetschera R.: Decision making styles and the use of heurustics in decision making. Journal of Business Economics, 86 (4), 2016, 389-412.

Jeong B., Sim S., Jung H.: Heuristics for assembly operation scheduling problem in flexible assembly systems. International Journal of Advanced Manufacturing Technology, 29 (9-10), 2006, 1033-1040.

Łunarski J.: Doskonalenie procesów projektowania działaniami innowacyjnymi w zautomatyzowanej produkcji masowej. Technologia i Automatyzacja Montażu. Zeszyt 3-2017. Warszawa 2017,4-5.

Magiera M.: Monolityczna metoda planowania montażu dotyczącego wielowariantowego sprzętu elektrycznego i elektronicznego. Przegląd Elektrotechniczny, 2017 R. 93, nr 8, 192-195.

Magiera M.: Wybrane metody planowania przepfyw6w produkt6w przez linie produkcyjne i łańcuchy dostaw. Wydawnictwa AGH, Kraków 2016.

www.gurobi.com (Gurobi Optimizer, 2018).